Intake desk
LinkScope Sourcing 52 reads the brief before it calls a factory
Use this page when the measurement task, quantity, and destination are ready to send. The dialog used on product cards is only the short form. This page adds the intake steps beside that same form.
How a brief is handled
- Channel. The form is the only intake. No street address, phone number, or social account is published, because none is operated as a public counter.
- Hours. Requests are reviewed on US business days after the required cells are present. No clock-time promise is offered.
- What to include. Measurement function, range, accuracy, frequency range, safety category, probe scope, quantity, destination, and requested timing.
- Budget. Optional. State currency and whether the figure is per unit or for the whole order. You do not need an existing quote.
- Supplier preference. High-end, mid-range, budget, or undecided. That is your stance, not a rating the desk has verified.
After the note arrives, the desk checks whether the cells can be sent to factories as one scope. Missing accuracy bands or a missing destination are returned as questions. Drawings can follow in a later message. They are not uploaded here.
Write measurement accuracy as a number with a frequency range, for example 1.5% of reading plus 5 counts from 45 Hz to 65 Hz, and say whether a second band to 400 Hz is required. Add the jaw opening in millimetres, the top current range, and the safety category you need the supplier to confirm, such as CAT III 600 V. Calibration traceability means a certificate date and the lab name, not a slogan. If leads are in scope, note connector mating cycle expectations and lead impedance only when the datasheet states them.
Two choices often sit in the same brief. A new meter usually starts a 12-month calibration interval near shipment. A refurbished meter can cover a discontinued jaw if the seller names replaced parts and the remaining interval. An original lead set follows the meter input category. A compatible lead may be easier to replace and can still be the wrong category for the circuit. State which side you want. The desk will not invent the missing side.
Three limits apply to every note sent from this page. The desk does not clamp a live feeder and does not certify IEC 61010 compliance. Ingress protection, when you need it, must be an IP code on the exact model, not assumed from a photo. A target budget does not become a published price, and a high-end or budget preference is not a verified factory grade. Runtime hours belong on the datasheet if shift length matters. Link the request to the evidence guide when the marking you saw was digital clamp meter 400V max AC amps and you still need the table behind it.